top of page
Pannellature EI compartimentazione antincendio in magazzino industriale

EI panels for fire compartmentation

We create certified fire compartmentation systems EI 30, EI 60, EI 90 and EI 120 for industrial warehouses, electrical substations, technical rooms and escape routes. Specialized design, supply and installation in compliance with current regulations.

When plant safety is measured in minutes

In the event of a fire, every minute gained is a life protected, a plant preserved, and a business that can restart. EI panels are certified construction systems that, in case of fire, prevent the spread of flames, smoke, and heat between different environments for a guaranteed time of 30, 60, 90, or 120 minutes.

The acronym EI represents two fundamental properties certified together: E (etanchéité, resistance to flames and hot smoke) and I (isolation, thermal insulation on the face not exposed to fire). The number that follows indicates the guaranteed performance minutes according to the UNI EN 13501-2 standard.

Creating an EI compartmentation does not just mean installing certified panels. It means designing a complete system of panels, supporting structures, joints, plant passages, and sealants that maintain their fire resistance class as a whole, not as a sum of components, respecting the test reports issued by the certifying body.

EI CLASSES

EI 30 — Thirty minutes of resistance
Solution for internal compartmentalization in low-risk environments, separation of small technical rooms, fire-rated suspended ceilings in non-strategic areas for evacuation.

EI 60 — Sixty minutes of resistance
Standard for most industrial compartmentalization: separation of production departments, warehouse insulation, protection of stairs and escape routes in medium-height buildings.

EI 90 — Ninety minutes of resistance
Strategic compartmentalization in complex industrial buildings, protection of medium-voltage electrical substations, insulation of rooms with flammable substances.

EI 120 — One hundred and twenty minutes of resistance
Maximum protection for high-risk situations: HV/MV transformer substations, critical archives and data centers, storage rooms for hazardous substances, compartmentalization in high-rise or high-occupancy buildings.

WHERE WE OPERATE

Industrial sector

Compartmentalization of production departments and warehouses

Protection of electrical and transformer substations

Insulation of technical rooms with critical machinery

Separation of flammable material storage areas

Compartmentalization of thermal power plants and boiler rooms

Protection of cable penetrations and plant crossings

HOW WE WORK

Our work process

Site inspection

System design

Specialized installation

Declaration of conformity

Every intervention starts with an on-site visit. We analyze the intended use of the environments, identify the compartments to be created according to the fire prevention project, and verify compliance with applicable regulations, Ministerial Decree of August 3, 2015, vertical technical rules for the sector, and any requirements from the Fire Brigade.

We define the EI class required for each compartment, select the panels and supporting structures certified as a system, size the joints, and design the construction details for plant passages—critical points where 80% of compartmentalizations fail in the event of a fire.

Installation is performed by personnel trained in the specific installation methods of each certified system. Every EI panel manufacturer requires precise procedures, fixings, types of screws, overlaps, and seals that must be respected to keep the certification valid.

At the end of the intervention, we deliver complete documentation: certifications of the materials used, technical data sheets of the system, and a declaration of correct installation signed by the installer. These documents are necessary for obtaining the Fire Prevention Certificate (CPI) from the relevant authorities.

Gallery

Due professionisti si stringono la mano in ufficio.

Let's talk about your project

Tell us what you need: a technical inspection, a quote, design consulting, or simply an initial discussion. We will respond within 24 business hours with a specialized technician.

Configurazione minima della scrivania

THE CRITICAL POINTS WE TAKE CARE OF

Joints and connections
The fireproof panel is only as good as its least performing joint. We treat every joint with certified intumescent sealants and specific installation procedures for EI class.

​

System penetrations
Pipes, cables, and conduits passing through a compartment require dedicated sealing solutions, intumescent pillows, collars, and specific foams. We design them as an integral part of the system.

​

Maintenance and inspections
After installation, we remain available for periodic inspections and maintenance work, which are essential for keeping the system's certification valid over time.

bottom of page